Search
Pulse
Pulse

Qorum · Phase 1 / Hearth

Roadmap

Snapshot ·

What’s built, what’s moving, and what comes next.

Linked issues closed 80%

393 of 490 issues · 68 blocks

Progress through a curated subset of design and implementation issues. Linked issues count once across phases; canceled and duplicate issues are excluded.

Priority order, with progress across tracked issues. Select a step to explore.

  1. Priority 1: Build throughput72% closed

    48 of 67 tracked issues closed. This excludes work not yet filed.

  2. Priority 2: Flow-related work100% closed

    39 of 39 tracked issues closed. This excludes work not yet filed.

  3. Priority 3: Lens search67% closed

    18 of 27 tracked issues closed. This excludes work not yet filed.

  4. Priority 4: Logged bugs95% closed

    36 of 38 tracked issues closed. This excludes work not yet filed.

  5. Priority 5: Notes & stickies100% closed

    6 of 6 tracked issues closed. This excludes work not yet filed.

  6. Priority 6: Oru & Pulse100% closed

    8 of 8 tracked issues closed. This excludes work not yet filed.

  7. Priority 7: Icon Studio100% closed

    19 of 19 tracked issues closed. This excludes work not yet filed.

  8. Priority 8: UI framework0% closed

    0 of 4 tracked issues closed. This excludes work not yet filed.

  9. Priority 9: FramesNot yet tracked

    No tracked issues yet. Scope is still to be defined.

  10. Priority 10: Client streams0% closed

    0 of 2 tracked issues closed. This excludes work not yet filed.

  11. Priority 11: ProductionNot yet tracked

    No tracked issues yet. Scope is still to be defined.

Deeper purple = more tracked issues closed

Recent progress

Newly completed work, with what it means.

  • Batch 771 · 670 · 685 published 2026-09-22 (4200 ✓ / 1 exempt, 61 min). Gate #23 on the same candidate had gone red on a single load flake (marks cost-ratio bound) — attribution cleared all three tasks, recovery resolved, re-gated. 771 is the first Ring-0 change under the new sign-off flow; kernel-change label re-applied after merge.

    QRM-771 · Done
  • Batch 744 · 775 · 754 · 734 published 2026-09-22 (4177 ✓ / 1 exempt, 55 min). Gate #21 had run green on the same code and was refused only because master moved mid-run (UI commits); #22 re-synced and admitted. The red-tree blocker was golden-template drift — 1,375 unreconciled dev_collection_sample schemas — repaired by running the boot reconcile on the template (class fix QRM-780). QRM-771 (kernel scope refusal) passed review and rides gate #23.

    QRM-744 · Done
  • Batch 727 · 765 · 717 · 757 · 773 published 2026-09-22 (4163 ✓). Gate #19 had gone red on the new census-freshness rule for two pre-rule branches; forward-fixed in 40 min. The T2b-i rewind automation (727) is live for the next red batch.

    QRM-727 · Done
  • A structured saved search becomes an on-demand Collection with the same root and criteria, through the Collections service and its authorization door (gate #5).

    QRM-714 · Done
  • The deterministic focused-test planner and exception classifier replace prose reasoning about which tests to run; the rehearsal cohort is path-glob gated (gate #4).

    QRM-703 · Done
  • The ten --color-qorum-* tokens are a governed SYSTEM ref set, offered in the Icon Studio colour picker; the shared purple stays one identity (gate #4).

    QRM-713 · Done
  • Budget-exceeded is no longer retried, forkserver preload recovers most of the per-call cost, and the startup timeout, close() masking and error text are fixed (gate #5).

    QRM-711 · Done
  • The governed grammar registry is asserted against an explicit list, and a rejected highlighter promise is no longer memoised (gate #5).

    QRM-708 · Done
  • One search surface over every labelled object with a per-viewer Iris, structured search, Pulse messages, saved Focus searches and the Cmd+K palette; landed as one seven-task batch through the new sprint gate.

    QRM-680 · Done
  • Implementation and review lanes now run the offline tier plus the touched slice's live tests instead of the whole 45-minute suite; the full suite runs once per batch on the sprint branch before master moves.

    QRM-710 · Done
  • Reviewed tasks merge to a sprint branch and master only moves after one full test run per batch — the first step of the throughput programme, activated after its own gated bridge.

    QRM-701 · Done
  • Code highlighting loads only the languages Qorum actually renders, through an explicit registry with a plain-text fallback — the largest single chunk in the dev graph is gone.

    QRM-677 · Done
  • A review no longer repeats a 43-minute full suite the implementer already ran on the identical tree — the reuse rule is live in the dispatcher's review prompt.

    QRM-695 · Done
  • Brand marks from Simple Icons render again in browse and search instead of a placeholder, and adding one to a palette stores it in the canonical form.

    QRM-672 · Done
  • The connector palette now seeds a generic plug as its fallback, and brand logos (JotForm first) are curated on top in colour.

    QRM-675 · Done
  • Icon Studio search and the discovery index now use Qorum's own icon service, so browsing and indexing no longer hit third-party rate limits.

    QRM-627 · Done
  • Beacons and node feeds now show unread counts and can be muted per viewer; your read position stays private to you.

    QRM-349 · Done
  • Opening a thread no longer marks everything read; a message is read when its row is actually in view, and reload shows the server's truth.

    QRM-497 · Done
  • Each pack carries a version lock; two branches bumping the same version now conflict before merge instead of failing in production.

    QRM-665 · Done
  • Each object type now declares its table, lifecycle and reserved columns in one place; start-up refuses to boot if the database disagrees.

    QRM-650 · Done
  • You can reply to a comment or a note (one level); who can see the reply follows what it is attached to.

    QRM-654 · Done
  • Palettes added after go-live now pick up new manifest icons automatically; the form-connector icon appeared on this deploy.

    QRM-652 · Done
  • Clients can no longer write the computed section of a record; the platform owns it.

    QRM-662 · Done

Explore the roadmap

Showing 14 of 68 blocks · completed history is tucked away

✓ Closed◷ In progress / review / monitoring△ Blocked / needs revision○ Planned / parked

Maintained snapshot from Linear and the agreed build order. Issue colours reflect the snapshot date; open Linear for the latest state.